Buy CK-104 LONG LEAD Crl Components Inc Part with NSN 5910-00-113-5499
Part Number: CK-104 LONG LEAD | Alternate P/N: CK104LONGLEAD | Manufacturer: Crl Components Inc | NSN: 5910-00-113-5499 (5910001135499) | NIIN: 001135499 | Item Name : Capacitor Fixed Ceramic Dielectr | CAGE Code: 71590 | FSC: 5910 Capacitors |
Part number CK-104 LONG LEAD under NSN 5910001135499 and FSC 5910 Capacitors is now available in our ready-to-ship-inventory. This part is a Capacitor Fixed Ceramic Dielectr manufactured by Crl Components Inc under CAGE Code 71590. To receive a quick quote for this part number, fill out the form
All the fields on this form are mandatory and the value of your quote will be determined primarily by your responses to the Need Parts By and Quantity (ea) fields. So make sure that everything is filled out correctly. A sales representative will contact you within 15 minutes of receiving your request.
Upload RFQ Sheet
If you have more than one item, upload your spreadsheet here
NSN Information for Part Number CK-104 LONG LEAD with NSN 5910-00-113-5499, 5910001135499
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item Description: Capacitor Fixed Ceramic Dielectr | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
Ck-104 Long Lead | B | 1 | C | A |
CHARACTERISTICS DATA of NSN 5910-00-113-5499, 5910001135499
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0/+15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS, BROCHURES,ETC., THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS, INDUSTRY DIRECTORIES, AND SIMILAR TRADE PUBLICATIONS, REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
Top Part Types
Aviation Axis is one of the leading suppliers of NSN part CK-104 LONG LEAD from Crl Components Inc and other long-lead time aviation parts in the US. Owned and operated by ASAP Semiconductor, an AS9120B, ISO 9001:2015, and FAA AC 0056B accredited company, we stock over 10 million unique NSNs from 26 distinct federally classified categories. With more than 2 billion parts sourced from over 5,000 manufacturers globally, we have one of the largest inventories of ready-to-ship parts. And because we offer same-day and next-day delivery, we’re perfect for meeting all your complex Aircraft on Ground (AOG) requirements.